Complete closure on B27: traffic jams and diversions until the end of June 2025!

Transparenz: Redaktionell erstellt und geprüft.
Veröffentlicht am

Traffic disruptions in Bietigheim-Bissingen: renovation work on the B27 from June 15th. until June 30, 2025. Pay attention to detours!

Verkehrsbehinderungen in Bietigheim-Bissingen: Sanierungsarbeiten auf der B27 vom 15.06. bis 30.06.2025. Umleitungen beachten!
Traffic disruptions in Bietigheim-Bissingen: renovation work on the B27 from June 15th. until June 30, 2025. Pay attention to detours!

Complete closure on B27: traffic jams and diversions until the end of June 2025!

From June 15, 2025 to June 30, 2025, there will be significant traffic disruptions in Bietigheim-Bissingen. A comprehensive renovation of the pavement on the B27 federal highway between Stuttgarter Straße and Freiberger Straße is leading to partial and full closures. This construction project is intended to improve the transport infrastructure and is part of the larger renovation project that began in May 2025. Drivers have to prepare for longer travel times and traffic jams [news.de](https://www.news.de/auto/858567937/verkehrsmelde-zur-vollsperrung-bietigheim-bissingen-stuttgart-baden-wuerttem mountain-disruption-due-to-renewal-on-the-ceiling-from-15-06-2025-to-30-06-2025-on-b27-stuttgarter-strasse-freiberger-strasse/1/) reported.

The specific construction project extends over a distance of 2.2 kilometers and includes several important road sections, in particular the B27. From 1:00 p.m. to 9:45 p.m. the individual lanes will be closed as follows: on Stuttgarter Straße / B27, OT Buch, in Poststräßle / B27, OT Bietigheim and in Freiberger Straße / B27, OT Bietigheim. The diversion for cars and trucks will lead via Carl-Benz-Straße to Bahnhofstraße, which means an additional route of 2 km and around 3 minutes longer.

Extensive construction work

The construction work, which is divided into several phases, began on May 5, 2025 with the first construction phase, which will lead to restrictions on the western side of the B27. This first construction phase stipulates that there will only be one lane in each direction between Gröninger Weg and Industriestraße, which can also lead to disruptions, as bietigheim-bissingen.de informs.

In addition, there will be a complete closure of the L1125 between Großsachsenheim and Bietigheim-Bissingen from June 22, 2025, which is likely to further aggravate the situation. The closure affects the section from the intersection of Industriestraße/L1125 to the intersection of L1125/K1636 (Kayhstraße). However, it is still possible to get to the JET gas station and the Holderbüschle industrial area from the direction of Sachsenheim.

Important information for road users

The city of Bietigheim-Bissingen points out that heavy traffic and extended travel times are to be expected during construction work. During this time, drivers in particular should prepare for the adjusted traffic routing and possibly changed access routes. The construction site management recommends using alternative routes and observing the current traffic information from the Baden-Württemberg Road Traffic Center. One-way traffic regulations are also expected in the surrounding streets, which could lead to further restrictions.

Overall, the construction project is part of the comprehensive renovation project on the B27, which aims to improve the safety and quality of the roads. Further details about the construction project are available on the city of Bietigheim-Bissingen website, which provides regularly updated information to provide residents and road users with the best possible information.