Traffic chaos in Denkendorf: construction sites and traffic jams threaten until the end of June!

Transparenz: Redaktionell erstellt und geprüft.
Veröffentlicht am

From May 30th, 2025 there will be traffic restrictions in Denkendorf (zip code 85095) until June 23rd, 2025 due to construction sites. Danger of traffic jams and diversions are to be expected.

Ab dem 30.05.2025 kommt es in Denkendorf (PLZ 85095) bis 23.06.2025 zu Verkehrseinschränkungen wegen Baustellen. Staugefahr und Umleitungen sind zu erwarten.
From May 30th, 2025 there will be traffic restrictions in Denkendorf (zip code 85095) until June 23rd, 2025 due to construction sites. Danger of traffic jams and diversions are to be expected.

Traffic chaos in Denkendorf: construction sites and traffic jams threaten until the end of June!

In Denkendorf, a small community in the Esslingen district, drivers must expect significant traffic disruptions from May 30, 2025. The reason is extensive maintenance work, renovations and expansion projects that will last until June 23, 2025. [News.de](https://www.news.de/auto/858640798/verkehrsmelde-denkendorf-zur-verkehrsstoerung-wegen-baustelle-sperrung-einschra from-30-05-2025-to-23-06-2025-restrictions-in-traffic-danger-of-congestion-in-denkendorf-zip-code-85095-on-st2229-on-am-berg/1/) reports that the construction sites will have a significant impact on traffic, especially on Am Berg Street and the adjacent streets. Restrictions begin at 7:30 a.m. and end at 3:00 p.m. every day.

Of particular note are the new diversions being put in place to support the construction work. The St 2229 is routed from Stammham via EI 19 Schönbrunn to Denkendorf. Another diversion leads from Kipfenberg via EI 22 Gelbelsee to St 2229 to Denkendorf. Due to the expected high traffic volume, long traffic jams could form, which could possibly last even beyond the usual peak hours.

Details about the construction sites

  • Baustelle 1: Fahrbahnverengung mit abwechselnd einem freien Fahrstreifen, Länge: 79 m. Standort: St2392, St2229, zwischen Thankostraße und EI19, Zandter Straße.
  • Baustelle 2: Ähnlich wie Baustelle 1, Länge: 93 m. Standort: St2229, St2392, zwischen EI19, Zandter Straße und Thankostraße.
  • Baustelle 3: Durchfahrt gesperrt, Fahrbahnerneuerung, Länge: 282 m. Standort: St2229, Am Berg, zwischen Zum Beetfeld und St2392, Wassertal.
  • Baustelle 4: Sichtweise analog zu Baustelle 3, Länge: 282 m. Standort: St2229, Hauptstraße, zwischen St2392, Wassertal und Zum Beetfeld.

Special attention is also being paid to the temporary traffic lights that were installed to regulate traffic flow during construction work. These measures aim to ensure the safety of road users while still allowing traffic to flow in an orderly manner.

Increased traffic volume

The announced restrictions are expected to lead to increased traffic volumes. Authorities warn of possible traffic jams that could occur during construction work. Mobile traffic jam warning systems could be installed to inform drivers about the traffic situation. Verkehrslage.de adds that the road construction site will be temporarily closed for the work and that signs will remind road users of the changed conditions.

The traffic management in Baden-Württemberg, for which Baden-Württemberg.de is responsible, will provide current traffic information throughout the entire construction phase. There will also be dynamic traffic signs that display traffic jam information and alternative routes to optimize traffic flow.

With these measures, those responsible want to ensure that all road users are as well informed as possible and that traffic disruptions can be kept as low as possible.