Complete closure in Renningen: pipeline work disrupts traffic!
From June 22nd, 2025 to June 27th, 2025 there will be a full closure on K1060 in Renningen due to pipeline work. Diversions have been set up.

Complete closure in Renningen: pipeline work disrupts traffic!
Today, June 22, 2025, the traffic situation in Renningen, Böblingen district, Baden-Württemberg, is affected by a complete closure. This restriction will come into effect from 10:00 p.m. and will last until 9:59 p.m. on Friday, June 27, 2025. The reason for the closure is extensive pipeline work affecting the K1060 and the north-south road. The exact length of the closed route is 188 meters, which means a diversion is necessary to direct traffic flows. Loud news.de Both cars and trucks must use alternative routes.
The diversions that control traffic in the affected region are designed as follows:
- Option 1: Nord-Süd-Straße – Industriestraße – Heinkelstraße – Benzstraße (0,5 km / 2 Minuten länger)
- Option 2: Nord-Süd-Straße – Benzstraße – Heinkelstraße – Industriestraße (0,5 km / 1 Minute länger)
Real-time traffic information
In order to better monitor traffic in the region, we recommend using online tools such as ADAC Maps. This platform not only offers real-time traffic flow and short-term disruptions, but also enables precise route planning for future trips. Users receive traffic forecasts based on the selected departure day and time. ADAC Maps also provides information about current and planned construction sites as well as possible dangers such as slippery snow or storm damage.
With the impending closure, every road user should allow sufficient time to re-plan their route to avoid delays. Regional drivers should increasingly prepare for alternative routes in the coming days in order to minimize the greatest possible disruption to traffic.