Complete closure of the B10 in Eislingen: tunnel maintenance ensures diversions!

Transparenz: Redaktionell erstellt und geprüft.
Veröffentlicht am

Full closure of the B10 in Eislingen/Fils from September 15, 2025 due to tunnel maintenance. Diversions available for cars and trucks.

Vollsperrung der B10 in Eislingen/Fils ab 15.09.2025 wegen Tunnelwartung. Umleitungen für PKW und LKW verfügbar.
Full closure of the B10 in Eislingen/Fils from September 15, 2025 due to tunnel maintenance. Diversions available for cars and trucks.

Complete closure of the B10 in Eislingen: tunnel maintenance ensures diversions!

Today, September 15th, 2025, there will be significant traffic disruptions in the area of ​​the B10 in Eislingen/Fils. The reason for this is necessary maintenance work on a tunnel, which will lead to two full closures. This maintenance work is critical to maintaining traffic safety on this important artery.

The first full closure will begin at 6:00 p.m. on Monday, September 15th and will last until 4:00 a.m. on Tuesday, September 16th. The affected section extends over a length of 2.2 km between the Eislingen-Ost and Eislingen-West junctions in the direction of Ulm-Stuttgart. Diversions for cars and trucks have been set up and lead via: Eichenbach, Ulmer Straße, Beundstraße, Bergstraße, Poststraße, Frauenstraße, Stuttgarter Straße and the Westtangente, which is about 1.3 km or 6 minutes longer.

Second full closure

The second full closure will follow on Tuesday, September 16th, from 6:00 p.m. until Wednesday, September 17th, at 4:00 a.m. This section runs from the Eislingen-West junction back to the Eislingen-Ost junction in the direction of Stuttgart-Ulm. Here too, detours were set for cars and trucks via the Westtangente, Stuttgarter Straße, Frauenstraße, Poststraße, Bergstraße, Beundstraße, Ulmer Straße and Eichenbach. This diversion is 0.7 km or approximately 7 minutes longer.

Drivers traveling during this time are advised to keep an eye on the current traffic situation. ADAC.de provides real-time information about traffic flow and disruptions, which can be helpful in route planning. The platform also provides information about construction sites and dangerous situations, which could support a stress-free journey.

These tunnel maintenance measures are essential to ensure the safety of road users and prevent possible accidents. It is therefore recommended to plan alternative routes in advance and use the diversions mentioned to minimize delays. Drivers should be prepared to allow extra time.